Weed Campus Construction Projects
Stage Bus Stop:
Pick up and drop off will be at the kiosk located in front of the Science building in parking lot E. This is only temporary until parking lot D is repaired and students can be dropped off safely.
Posted August 5, 2026
Student Housing:
The foundation for the building will be poured beginning at 4:00 am on August 13 and 14. Glulam's are scheduled to arrive on Monday, and steel will arrive on site Tuesday. Most trade sub-contractors will be on site beginning next week. The erection of the structure will move fast.
Posted August 12, 2026
Theater / McCloud Hall:
The Theater Building will continue abatement work through the end of next week.
Posted August 12, 2026
Welcome to the ÐÓ°É construction projects hub — your central resource for updates on campus enhancements designed to elevate learning, living, and community engagement. From new student housing to the modernization of our existing theater and performance spaces, each project reflects the college's commitment to creating inspiring, functional environments for students, staff, and visitors. Explore how these developments are shaping the future of the COS campus and supporting a vibrant, thriving educational experience.
The new 36,000-square-foot housing unit will include 83 rooms (6 Single Capacity, 77 Double Capacity), along with one ARD apartment, three community kitchens, laundry facilities, study and game rooms, and shared community spaces designed to foster a supportive and engaging environment for students. The project is 100% state-funded, with a total investment of approximately $30 million. In compliance with state law, the housing will be classified as affordable, ensuring access for students in need.
Student Housing Prequalification Advertisement
Student Housing Prequalification Application
Student Housing Board Presentation
The ÐÓ°É is moving forward with essential upgrades to McCloud Hall and the Theater Arts building, with both projects carefully designed to stay within the available budget. McCloud Hall upgrades will include updating the Ceramics Classroom and Exterior Ceramics Lab — such as equipment, HVAC, floor drains, and enclosure enhancements — as well as ADA restroom upgrades, locker improvements, and new interior and exterior paint. The Theater Arts building will be modernized, extending the building's lifespan by roughly 25 years through seismic strengthening, fire-life safety, and accessibility improvements, hazardous materials abatement, and a full roof replacement. Aside from required seismic and HVAC upgrades, the auditorium will remain unchanged to avoid triggering cost-prohibitive modifications. Together, these improvements will enhance safety, functionality, and learning environments across both facilities.
Theater and McCloud Prequalification Advertisement
Theater and McCloud Prequalification Application
Theater Arts and McCloud Hall Reconstruction Project Update:Informational Board Presentation
Siskiyou Joint Community College District, ÐÓ°É, Theatre-Arts Bldg
Dramatic Arts Building Record Set
Geotechnical Investigation and Geologic Hazards Evaluation Report
Revised Geologic Hazards and Geotechnical Engineering Report
Office Hours: Monday - Friday, 7:00 am to 4:00 pm
Veronica Rivera
Phone: (530) 938-5233
Email: vrivera@siskiyous.edu